Burnham Institute for Medical Research

Burnham Institute for Medical Research

BCH Mechanical was selected to be part of the construction team in a Design Assist role and then moved directly into the construction phase to ensure that the highest quality systems were obtained, in the most cost-effective manner for the maximum benefit to the...

Fast Track Division

While BCH is best known for performing extensive, multi-million dollar projects, our firm also performs smaller jobs within the state of Florida.The BCH Fast Track Division was established several years ago when two long-time leaders in Estimation and Production...
Buccaneers Training Facility

Buccaneers Training Facility

This was the new facility for the Tampa Bay Buccaneers that was built on the old Tampa Bay Mall site next to the stadium. BCH Mechanical was selected as the design/builder on this project providing both HVAC and Plumbing design and construction. The office portion...
Westfield Shopping Mall (Countryside)

Westfield Shopping Mall (Countryside)

The Westfield Group is the largest retail property group in the world, with shopping centers in four countries and a total value in excess of $33.2 billion.   BCH Mechanical was chosen to design/build this turnkey project with a new complete replacement of their...
Nemours Children’s Hospital

Nemours Children’s Hospital

The Nemours Children’s Hospital is a new $400 million, 95-bed facility that is slated to open in 2012. The 620,000 square-foot children’s hospital is part of a 60-acre pediatric health campus featuring an integrated pediatric health care system. This...