First Baptist Church of Palmetto

First Baptist Church of Palmetto

BCH Mechanical was selected by the First Baptist Church to provide design/build services for replacement of their aging chilled water system. All work was performed without interruptions to the ongoing activities, including services beginning Sunday afternoon through...
Burnham Institute for Medical Research

Burnham Institute for Medical Research

BCH Mechanical was selected to be part of the construction team in a Design Assist role and then moved directly into the construction phase to ensure that the highest quality systems were obtained, in the most cost-effective manner for the maximum benefit to the...
Buccaneers Training Facility

Buccaneers Training Facility

This was the new facility for the Tampa Bay Buccaneers that was built on the old Tampa Bay Mall site next to the stadium. BCH Mechanical was selected as the design/builder on this project providing both HVAC and Plumbing design and construction. The office portion...
Westfield Shopping Mall (Countryside)

Westfield Shopping Mall (Countryside)

The Westfield Group is the largest retail property group in the world, with shopping centers in four countries and a total value in excess of $33.2 billion.   BCH Mechanical was chosen to design/build this turnkey project with a new complete replacement of their...
Linvatec (ConMed)

Linvatec (ConMed)

This was a major mechanical retrofit to an existing building located in Largo, Florida. The existing building was conditioned with direct expansion air conditioning equipment and the retrofit converted the mechanical systems to water cooled chilled water.   A new...